Home / News / News

Daily maintenance of equipment

May. 27, 2020

1. Daily maintenance

Before and after the shift by operators carefully check the equipment, wipe each part and add lubricating oil, so that the equipment often keep neat, clean, lubrication, safety. And carefully done

Good spot check record and shift shift record.When equipment failure occurs in the shift, timely report the failure, participate in troubleshooting, record the failure time and cause, and confirm the maintenance effect.

2. Primary maintenance: operators are given priority to, and maintenance workers provide guidance

Carry out partial disassembly, inspection and cleaning of the specified parts of the equipment according to the plan;

Dredge oil routes and pipelines, replace or clean oil lines, linoleum and oil filters;

Adjust the clearance of each part of the equipment and tighten each part of the equipment.

3. Secondary maintenance: maintenance-oriented, included in the equipment maintenance plan

Carry out partial disassembly inspection and repair of the equipment;

Replace or repair worn parts, clean and change oil;

Inspect and repair electrical parts;

Partial recovery accuracy, to meet the minimum requirements of machining parts.


Daily maintenance of equipment

Latest Post
Hot Products
EBZ200 hot sale underground coal mining equipment boring machine roadheader for sale EBZ200 hot sale underground coal mining equipment boring machine roadheader for sale
EBZ135 Roadheader For Mining and Tunneling EBZ135 Roadheader For Mining and Tunneling
Loreen Wet Shotcrete Spraying Concrete Machine Jpts4-L Model Loreen Wet Shotcrete Spraying Concrete Machine Jpts4-L Model
+86 183 6560 8577 loreentrade@outlook.com 33591499